Solar + storage retrofit (AC-coupled)
Add a battery with its own PCS to an existing solar plant.
System integration
We connect batteries, inverters, solar, genset controls, switchgear, chargers and software from different makers into one tested system, and take responsibility for the interfaces between them.
Interfaces
In EPRI's analysis of battery failures, most failed elements sat outside the cells, in the balance of system and the controls.
String design, fusing, protection coordination and insulation monitoring.
PCS settings, transformer and panels, relay coordination, earthing, and grid settings agreed with the DISCOM.
Changeover, ATS and synchronising panels reworked so battery and genset hand over cleanly.
One control philosophy, run by the energy management system (EMS), across battery, solar, gensets and chargers.
BMS, PCS, meters and chargers on open protocols (Modbus, IEC 61850, OCPP), with protection kept separate from monitoring.
Cooling, detection, suppression and ventilation interlocked with the BMS, so an alarm leads to a safe shutdown.
Plinths, drainage, cable trenches, fencing, service access and corrosion protection near the coast.
Source: EPRI, Insights from EPRI's BESS Failure Incident Database: Analysis of Failure Root Cause (opens in a new tab) (May 2024).
Architectures
Seven common ways a battery system connects to the equipment already on a site.
Add a battery with its own PCS to an existing solar plant.
Solar and battery share an inverter, so the battery can capture energy that would be clipped.
A hybrid controller decides when the genset starts; the battery handles transients and light loads.
The UPS protects the most sensitive loads; the battery carries the wider site for longer.
The battery buffers fast chargers, and charger power is managed against the site limit.
Grid-forming PCS, transfer switching and load shedding keep critical loads running when the grid is down.
Several sites report to one monitoring layer (Energy 107), with common alarms and reports.
About Energy 107Source: NREL (now NLR), Evaluating the Technical and Economic Performance of PV Plus Storage Power Plants (opens in a new tab) (August 2017).
Vendor-neutral
We don't represent any one maker or sell from a catalogue. When supply is included, we score the options against published criteria and show you the scores.
Commissioning
Source: CEA, Central Electricity Authority (Cyber Security in Power Sector) Regulations, 2026 (notification) (opens in a new tab) (31 July 2026).