Design & build (EPC)
Survey, design, civil works, charger supply, installation and commissioning under one contract.
- DISCOM and Electrical Inspectorate paperwork
- Protection, earthing and surge design
EV charging
Pioneers in EV charging infrastructure. We design, install, operate and maintain chargers for hosts, fleets and networks, adding battery storage where the connection is tight.
Services
From the first drawing to chargers already in service, including ones someone else installed.
Survey, design, civil works, charger supply, installation and commissioning under one contract.
Your chosen charger installed, tested and commissioned to the maker’s requirements and CEA safety rules.
Remote monitoring over OCPP, preventive maintenance, repairs and the records owners must keep, or we run the station for you.
A battery, filled from a smaller connection or solar, supplies the bursts fast chargers need.
AC or DC charging for e-3W, cabs, vans and buses, scheduled around your shifts and the tariff.
Health checks, repairs and upgrade plans for installed chargers, including older Bharat-standard and non-OCPP units.
Sites
Source: Wikipedia, National Highway 66 (India); National Highway 44 (India) (opens in a new tab) (2026).
Source: DT Next, EV charging facility made mandatory for bigger buildings in Tamil Nadu (opens in a new tab) (8 November 2025).
DC fast charging for travellers on NH44 and NH66, and AC for overnight guests.
AC and light-EV points sized for visitors who stay an hour or more.
Staff, visitor and fleet charging within your premises, metered separately where it pays.
Tamil Nadu’s building rules require charging points in new buildings above a size threshold; we design them to share the supply.
Workplace and fleet charging within your sanctioned load, scheduled around your processes.
Safe clearances and approvals around fuel dispensers, designed in from the first drawing.
Charger types
Match the charger to the vehicle and to how long it stays.
| Charger | Power | Best for | Standards (device / connector) |
|---|---|---|---|
| Light EV AC point | up to 7 kW | Scooters, e-autos and small cars | Device IS 17017-22-1Connector IS 60309 socket; vehicle inlet IS 17017-2-7 or 2-2 |
| Light EV DC (Type 6) | up to 12 kW | Scooters and e-autos needing a quick top-up | Device IS 17017-25Connector IS 17017-2-6 |
| LECCS (Type 7) | up to 7 kW AC / 12 kW DC | 2W and 3W | Device IS 17017-31Connector IS 17017-2-7 (BIS, 2023) |
| Type 2 AC | 7.4 / 11 / 22 kW | Cars parked for hours | Device IS 17017-1Connector IS 17017-2-2 |
| CCS2 DC | 50–250 kW | Highway and city fast charging | Device IS 17017-23Connector IS 17017-2-3 |
| CCS2 DC high power | 250–500 kW | Buses and trucks | Device IS 17017-23Connector IS 17017-2-3 |
Source: Ministry of Power (copy hosted by WBSEDCL), Guidelines and Standards for Electric Vehicle Charging Infrastructure, 2024 (opens in a new tab) (17 September 2024).
Battery buffer
Cheapest 09:00–16:00 Dearest 06:00–09:00 · 18:00–22:00
The grid, or solar, charges the battery within your existing connection.
When a vehicle plugs in, the charger draws on the grid and the battery together.
The battery recharges between sessions, ideally in cheaper hours.
Whether a buffer beats a bigger connection depends on charger use, your tariff and upstream costs, so we model both side by side.
Tamil Nadu’s EV tariff is cheapest from 9 am to 4 pm (TNERC Tariff Order No. 6 of 2025), so a battery can store daytime energy for evening charging.
In forceRevision pending as of September 2026Source: TNERC, Tariff Order No. 6 of 2025 (opens in a new tab) (30 June 2025, effective 1 July 2025).
Process
Most delays come from the connection and the paperwork, so we start both on day one.
Parking, cable routes, supply, battery space.
Deliverable: Survey notes & photos
Sanctioned load, tariff category, charger mix.
Deliverable: Connection options
Protection, earthing, cabling, civil works.
Deliverable: SLD & layout
Connection or load-change application.
Deliverable: Application file
Foundations, cabling, charger mounting.
Deliverable: Installation records
Safety tests, inspectorate clearance, software onboarding.
Deliverable: Commissioning report
Monitoring, maintenance, repairs, records.
Deliverable: Monthly report
Rules
Setting up a charging station is de-licensed: anyone can do it by following the Ministry of Power guidelines.
DISCOMs must connect within 3 to 30 days depending on the area (90 if the network needs extending) and offer LT connections up to 150 kW.
Service charges at public stations are capped until 31 March 2028 (AC ₹3–4, DC ₹11–13 per kWh, before GST) and must be displayed.
CEA safety rules ban adaptors and extension leads, require earth-continuity monitoring, and make owners keep test records for at least 7 years.
Tamil Nadu’s EV tariffs (LT-VII, HT-V) are cheapest from 9 am to 4 pm, and smart ToD meters are mandatory.
PM E-DRIVE funds public charging on government-proposed sites until 31 March 2028:
Nodal agencies run the stations or pick operators by bidding, so private hosts usually can’t apply directly.
Source: Ministry of Heavy Industries, PM E-DRIVE operational guidelines for public charging stations (opens in a new tab) (26 September 2025).
Source: Autocar Professional, PM E-DRIVE scheme extended till FY28 end (opens in a new tab) (8 August 2025).
Cheapest 09:00–16:00 Dearest 06:00–09:00 · 18:00–22:00
Source: Ministry of Power (copy hosted by WBSEDCL), Guidelines and Standards for Electric Vehicle Charging Infrastructure, 2024 (opens in a new tab) (17 September 2024).
Source: CEA, CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, Chapter XI (opens in a new tab) (8 June 2023).
Source: TNERC, Tariff Order No. 6 of 2025 (opens in a new tab) (30 June 2025, effective 1 July 2025).
Rules change. We check the current position for every project.
Partners
National networks bring the app, roaming and payments; we install and maintain the hardware in southern Tamil Nadu.
Source: Renewable Watch, Ministry of Power issues guidelines for installation and operation of battery swapping and charging stations (opens in a new tab) (15 January 2025).
Get in touch
Tell us the site, the vehicles and how long they stop, and we’ll check what your connection can carry.