01. Assess
What happens
- Site walk: SLD, transformer, space and access
- Load and tariff analysis from bills and meter data
- Sizing options with assumptions shown
Deliverable
Load & tariff report and sizing options
Our role at this stage
How we work
Six stages, each ending in a named document. The process stays the same whatever role we take.
Lifecycle
What happens at each stage, what you receive, and the role we take.
What happens
Deliverable
Load & tariff report and sizing options
Our role at this stage
What happens
Deliverable
Design basis report, SLD and specification
Our role at this stage
What happens
Deliverable
Installation records and as-built drawings
Our role at this stage
What happens
Deliverable
Commissioning report and handover dossier
Our role at this stage
What happens
What happens
Deliverable
End-of-life plan, agreed at contract
Our role at this stage
Before we start
A phone call is enough to start; these make it more useful.
On site
Electrical work is done and certified by licensed contractors and supervisors, as Tamil Nadu rules require.
Battery safety designHandover
What your team receives when we hand over a system.
Operation, alarms, safe isolation and emergency stops, with a signed record.
A site visit for the local fire station to walk through the layout and isolation points.
As-built drawings, test reports, certificates, manuals and warranties.
Recommended spares, escalation contacts and the warranty process.
Start with a conversation
Tell us where your project stands and we'll say which stage to start from.